Preview only · wording waiting on Van’s approval
Service areas · Alameda Countyaffordableroofingbayarea.com/roofing/dublin

Roofing in Dublin

Our Dublin replacement work has included new backing, sheathing and fascia. Existing materials and any dry rot affect which inspections must happen before covering.

Get an instant estimate Book a visit
Photo — a familiar Dublin landmark
city-dublin.jpg
Our work in Dublin

Roofs we’ve done in Dublin

Every pin is a job we’ve done here. Click a job to find it on the map.

  • Roof replacements
  • Solar by GoSimpleSolar

Most recent jobs in Dublin

Click a job to find it on the map

Dates show the milestone on file for each job, like the invoice or the utility’s approval to operate. Older jobs may list products we no longer install.

Permit

Roof replacement permits in Dublin

We pull it and schedule the inspections. It’s billed at the city’s actual cost, separate from the roof.

Permit authority
City of Dublin, Community Development Department, Building & Safety Division
Permit planning
ARS allows approximately one week for permits unless the department confirms a shorter route; issuance is not guaranteed.
Permit fee planning
Dublin’s FY2026/27 single-family roofing-replacement fee is $326, effective July 1, 2026. Technology, state and any scope-specific charges can add to that base; confirm the assessed total before payment.

From the Dublin building department and our own project records. Content reviewed October 11, 2026; inspection guidance checked October 10, 2026. Fees change, so we confirm yours when we pull the permit.

Inspections

Inspections and booking

  1. Deck and sheathing — For composition-to-composition tear-off, Dublin requires a tear-off inspection when dry rot is present, followed by final. Shake-to-composition work requires a sheathing inspection. Confirm the pre-cover check for any repaired or replaced decking before concealing it.
  2. In-progress — Dry rot on shake or composition reroofs triggers Dublin’s in-progress requirement, which may involve underlayment removal, replacement sheathing, nailing or battens. Composition-to-composition work without that condition does not have a routine in-progress stage in the standard sequence; follow any additional checks on your permit.
  3. Final closeout — Required after roofing and applicable code/energy/chimney-spark-arrestor requirements are complete. Provide the completed CF-1R-ALT identifying products and installation; smoke/CO compliance must be inspected before permit final.
  4. Scheduling — Request through Citizen Self-Service by 5 a.m. on inspection day, or call 925-833-6620 by 4:45 p.m. the prior business day. AM/PM requested windows are not exact appointments; call 7:15–8 a.m. for inspector coordination.
Local projects

Local roofing decisions

A historical replacement included backing and fascia

Our Dublin record from August 2013 describes removal of synthetic cal-shake, new backing and sheathing, and eight ventilation vents before the replacement shingle roof was finished. Wood work included three fascia boards, gutter fascia across the front of the second story and several overhang boards. The old material dimensions in that record are historical, not a current design specification. For a new job, the exposed condition and issued permit determine the repair and inspection plan.

Official references

Inspections checked October 10, 2026; public prose and permit-cost source mapping reviewed October 11, 2026. Fee components retain their stated effective dates; historical examples are not current quotes. See individual official references for applicability.

Nearby cities we roof
PleasantonSan RamonDanvilleLivermore All cities

See what a new roof would cost on your Dublin home.

Get an instant estimate (925) 381-9162