Roofing in Crockett

Two documented Crockett replacements provide different examples of roof-detail planning: a mixed shingle and membrane roof with a Dutch gutter, and a later project with custom chimney flashing, a cricket and fan work.

Get an instant estimate Book a visit
Photo — a familiar Crockett landmark
city-crockett.jpg
Our work in Crockett

Roofs we’ve done in Crockett

Every pin is a job we’ve done here. Click a job to find it on the map.

  • Roof replacements
  • Roof repairs

Most recent jobs in Crockett

Click a job to find it on the map

Dates show the milestone on file for each job, like the invoice or the utility’s approval to operate. Older jobs may list products we no longer install.

Permit

Roof replacement permits in Crockett

We pull it and schedule the inspections. It’s billed at the city’s actual cost, separate from the roof.

Permit authority
Contra Costa County Building Inspection; confirm the property’s jurisdiction.
Permit planning
ARS allows approximately one week for permits unless the department confirms a shorter route; issuance is not guaranteed.
Past ARS permit cost
Our August 2025 Crockett reroof invoice listed $271.00 as the contractor-billed permit charge. It was separate from the fan repair and installation, custom chimney metal and other roofing work on that job. When comparing a similar mixed-scope proposal, keep the permit allowance separate from those construction items so a change to the fan or flashing work is not mistaken for a change in the permit charge. The $271 is a historical invoice example, not a municipal payment receipt or today’s County quote.
Permit fee planning
County residential reroof base components are $150 plus $38 processing; surcharges and any separate local approvals add to the assessment.

From the Crockett building department and our own project records. Content reviewed October 11, 2026; inspection guidance checked October 10, 2026. Fees change, so we confirm yours when we pull the permit.

Inspections

Inspections and booking

  1. County inspection holds — County stages are 123 Roof/In Progress, preferably 25–75% complete for composition, then 120 Final after completion. Confirm deck, repair and nailing holds—including code 108—before covering, and obtain approval at every assigned stage; a separate deck visit depends on the permit.
  2. Final closeout — Clear any County CalGreen hold through Green Halo before final; allow up to four business days. Confirm remaining conditions and roof access.
  3. Booking — Book through County ePermits or 925-646-4108; confirm current deadlines and availability before tear-off.
Local projects

Local roofing decisions

How did the flat roof and Dutch gutter fit into one scope?

A January 2015 Crockett replacement record combines composition shingles with a TPO membrane on the flat portion. The flat-roof work included two courses of FR-10 base sheet, and the scope explicitly extended the TPO around the Dutch gutter. Plumbing penetrations, four ventilation vents and ridge work were also listed.

For a homeowner comparing mixed-roof proposals, that gutter detail is useful because the work did not stop at naming a membrane product. The scope addressed where the membrane continued around the drainage feature. A new proposal should likewise identify the flat and pitched areas and their perimeter and drainage connections, including what existing gutter components remain. The materials describe that Crockett job; a new assembly needs its own current design and fire-rating check.

What did the later chimney and fan work include?

A Crockett replacement recorded in August 2025 removed one composition layer and included a custom upper fireplace saddle, new counterflashing, step flashing and a cricket. Its record also lists fan repair and installation work and a Natural Light solar-powered fan.

The useful homeowner question is what the proposal includes at the chimney and around existing equipment. “New flashing” can be made more reviewable by naming the connection, the custom metal and any adjoining roof detail included in the price. The fan scope should also distinguish retained equipment being repaired from a newly supplied unit. No measured airflow result is available for that fan work. Assess another chimney before choosing its flashing detail. The August 2025 invoice also names CertainTeed Landmark composition and new plumbing vents and jacks.

Straight answers

Questions for this project

Should changing the look of an older Crockett roof prompt a planning check?

Crockett’s policies in the 2024 County General Plan emphasize historic context and sensitive rehabilitation of older buildings. Before changing a visible roof form or material, ask County planning which parcel-specific review applies. This policy does not make every reroof subject to design review or establish that a new design guideline has been adopted. Design approval is not confirmed for either historical project described here.

Official references

Inspections checked October 10, 2026; public prose and permit-cost source mapping reviewed October 11, 2026. Fee components retain their stated effective dates; historical examples are not current quotes. See individual official references for applicability.