Does the estimate cover the whole roof or one level?
A March 2015 Clayton record limits shake removal to the second-story portion. It then lists new sheathing, replacement composition shingles, new plumbing jacks and six ventilation vents for that scope. The lower roof was outside the described replacement scope.
For a homeowner reviewing a partial reroof, the useful starting point is a clear boundary. The proposal should identify which roof level is being opened, which covering remains, and where the new work connects to it. The plumbing and ventilation items should also be tied to the included area. A different two-story Clayton home may need a different division of work. A lower price for one level cannot be compared directly with a price covering the entire roof.